Existing installation
Los Nogales (Phase 1)
Photovoltaic solar plant with battery energy storage (BESS), located in Zacapa, Guatemala.
- 6.59 MWp of photovoltaic capacity
- Battery energy storage (BESS)
- Bifacial N-TOPCon modules of 710 Wp
- Sungrow medium-voltage infrastructure
- AMM verification of the main and backup meters
Operating status to be confirmed.

